[an error occurred while processing this directive]

HP OpenVMS Systems

ask the wizard
Content starts here

Batch queue entry management?

» close window

The Question is:

 
How do I delete a single entry of a batch job that contains multiple entries
 without stopping the entire batch job?
 
 


The Answer is :

 
  A queue entry and a batch job are the same -- one entry, one job.
 
  If you have a queue entry referencing multiple procedures, you can
  only delete all procedures that are part of the entry, or you can
  recode the individual command procedures to check for an
  application-specific exit condition indicator (eg: a logical name,
  etc), or you can submit the procedures as separate entries and use
  synchronization (eg: SYNCHRONIZE command) and/or a one-entry batch
  queue limit.
 

answer written or last revised on ( 20-SEP-2001 )

» close window